The Perth City Link Rail Project was a $360 million rail project which is part of the overall $609 million Perth City Link infrastructure project.

In order to carry radio services providing coverage to the new Fremantle line tunnel and parts of Perth station, a transmission system was installed to carry voice circuits from the Public Transport Centre in East Perth to the Perth Station.

Titan ICT were engaged to install, test and commission a PDH transmission system to support the voice mobile radio system. The project involved tight time constraints as the rail tunnel was required to become operational during a five day public rail system shutdown.

Case Study Button