Text
VoLTE Edge: Mission Critical Voice Over LTE
27/06/2016
Author: Super User
Category: White Papers
This paper was initially presented at Rodrigo Alvarez at the 2016 Australasian Conference for Railway Excellence in Melbourne and examines the new Mission Critical Push To Talk (MCPTT) Voice over...
MPLS as an alternative to PDH for Teleprotection Signalling
11/01/2016
Author: Super User
Category: White Papers
This paper will discuss the communications requirements for teleprotection signalling and suggest that MPLS based technology is a viable alternative to PDH for supporting protection applications. Req...
Defining the CBTC over LTE Interface - Riding the Wave
11/01/2016
Author: Super User
Category: White Papers
This paper examines the requirements that a radio data transmission network needs to meet to serve as the train-to-wayside radio bearer for a Communications-Based Train Control (CBTC) system.  R...
Railway Communications - Digital Radio System
08/07/2015
Author: Super User
Category: Projects
Titan ICT Consultants was engaged by the Public Transport Authority ('PTA') to manage the deployment of a new digital radio system to provide critical voice and data connectivity over the Perth metrop...
Midwest Rail Upgrade
08/07/2015
Author: Super User
Category: Projects
Between 2010 and 2013, Titan ICT  was involved in and the planning and detailed design of the Midwest Rail Upgrade, and then assisted Brookfield Rail with tender documentation and in management, ...
ICT Solutions within Mining Operations
08/07/2015
Author: Super User
Category: Projects
Titan ICT Consultants has been providing a ongoing project management and engineering services to BHP Billton over the past six years, including but not limited to, assistance for the LTE planning pro...
In Pit Wireless Network
07/07/2015
Author: Super User
Category: Projects
Titan ICT has been involved in and continues to provide engineering advice and assistance on Rio Tinto’s 4G wireless project. Our involvement initially commenced with assisting in business case deve...
ETCS L2 and CBTC over LTE: Convergence of the radio layer in advanced Train Control Systems
30/06/2015
Author: Super User
Category: White Papers
This paper was presented at the IRSE (Institution of Railway Signal Engineers) technical meeting held over 19 & 20 October 2013 in Perth and explores the role of LTE in solving the current challen...
Network Extension Construction Supervision - Rio Tinto
26/05/2015
Author: Super User
Category: Projects
The Koodaideri open cut iron ore mine located in central Western Australia is owned and operated by Rio Tinto. Telecommunications services were required to support the construction of the mine and ong...
IT OT Integration - Oil & Gas
26/05/2015
Author: Super User
Category: Projects
With a non-negotiable objective to achieve first gas within a specific timeframe, Titan's Principal Enterprise Architect was engaged to define a roadmap that would identify synergies and efficiencies ...
^Top