Systems Integration

  • CBTC over Wi-Fi - Gathering Clouds

    This paper was presented at AusRail 2015 held in Melbourne and examined the requirements that a radio data transmission network must meet to serve as the train-to-wayside radio bearer for a Communications-Based Train Control (CBTC)

    ...
  • Defining the CBTC over LTE Interface - Riding the Wave

    This paper examines the requirements that a radio data transmission network needs to meet to serve as the train-to-wayside radio bearer for a Communications-Based

    ...
  • Definitive Feasibility Study

    API Management Pty Ltd (API) manages Australian Premium Iron Joint Venture (APIJV). APIJV is an unincorporated joint venture established to develop a long term iron ore export operation in the Pilbara region of

    ...
  • Delivering Optimal WiFi Connectivity

    A world-leading hotel chain situated in Perth was experiencing a technical issue that had become their number one guest complaint. Immediate action was demanded by Hotel Management to remedy the issue of poor WiFi connectivity.

  • Detailed Engineering Design

    The West Pilbara Iron Ore project managed by API (a joint venture between Aquila Resources Limited and American Metals and Coal International Incorporated) shall be developing a 30MTPA pisolite mine and

    ...
  • Digital Mobile Radio(TETRA Vs P25)

    The purpose of this paper is to provide an overview and compare the benefits, features and functionality of digital mobile radio systems in the 400MHz band as a reflection of recent changes to ACMA licensing regulations. Two such systems of

    ...
  • Entertainment Systems for Accommodation Camps

    The purpose of this paper is to provide an overview of the important elements of entertainment systems for accommodation camps as well highlight the experience of Titan ICT Consultants in the design and implementation of these

    ...
  • ETCS L2 and CBTC over LTE: Convergence of the radio layer in advanced Train Control Systems

    This paper was presented at the IRSE (Institution of Railway Signal Engineers) technical meeting held over 19 & 20 October 2013 in Perth and explores the role of LTE in solving the current challenges faced by Advanced Train Control Systems in

    ...
  • FMG - Communication Network Extension

    Client Worley Parsons
    Project Christmas Creek Detailed
    ...
  • FTTH – topology options and considerations

    This paper describes options for deployment of Fibre to the Premise access networks. Key enabling technologies and products are described; total costs of ownership and current evidence for deployments by other carriers are included in the scope of

    ...
  • Gindalbie - Iron ore Project

    Client WestNet Rail (WNR)
    Project Karara to Geraldton Railway
    ...
  • Integrated communications network for Coal Seam Gas System

    The Coal Seam Gas industry has recently become one of the fastest growing industries in Australia and as CSG drilling grows in size so does requirement from its communications and control systems. 

    Request the free Coal Seam

    ...
  • IT OT Integration - Oil & Gas

    With a non-negotiable objective to achieve first gas within a specific timeframe, Titan's Principal Enterprise Architect was engaged to define a roadmap that would identify synergies and efficiencies between

    ...
  • MPLS as an alternative to PDH for Teleprotection Signalling

    This paper will discuss the communications requirements for teleprotection signalling and suggest that MPLS based technology is a viable alternative to PDH for supporting protection applications.

    Request the free MPLS as an

    ...
  • Network Extension Construction Supervision - Rio Tinto

    The Koodaideri open cut iron ore mine located in central Western Australia is owned and operated by Rio Tinto. Telecommunications services were required to support the construction of the mine and ongoing operations.

    ...
  • Opportunities & Challenges For deployment of LTE in a mining setting

    The mining industry has been embracing new technologies as it strives to increase both production base and efficiency in tough economic markets. This White Paper provides an overview of LTE technology and investigates what challenges are presented to

    ...
  • Perth City Rail Alliance

    Installation, Test and Commission PDH Transmission Systems for the Perth City Link Rail Project

  • Radio Upgrade

    Titan ICT was approached by the City of Wagga Wagga to develop a study to assess the Digital Land Mobile Radio market and to provide advice for a specific technology solution and transition strategy.

  • Rio Tinto - MPLS/DWDM Network

    Client Rio Tino
    Project PHiSCom Wave 1
    ...
  • Solutions Delivery

    Titan ICT provides comprehensive Solutions Delivery across a full range of technology specialisations and is recognised as an industry leader for delivering innovative and cutting-edge ICT solutions.

    We understand that the successful delivery

    ...
^Top